Menu

Consultancy Services

S.N. Title Sponsoring Agency Duration PI
1. Cumulative environment impact assessment studies for Satluj basin in Himachal Pradesh AHEC,
IIT, Roorkee
12 months
 
Dr. Sharad Kr. Jain
 
2. Cumulative environment impact assessment studies for Yamuna basin Uttrakhand Jal Vidyut Nigam, Dehradun 10 months Dr. Sharad Kr. Jain
 
3. Cumulative impact study of hydropower projects on Alaknanda & its tributaries and tributaries of Bhagirathi river, Uttarakhand Uttrakhand Jal Vidyut Nigam, Dehradun 12 months Dr. Sharad Kr. Jain
 
4. Gangetic aquifer management for Ecosystem services (GAMES) study IWMI Srilanka 12 months Dr. Sharad Kr. Jain
 
5. Glacial Lake Outburst Flood (GlOF) Study For Jelam Tamak H.E. Project, THDC THDC India Ltd. 2 months Dr.Sanjay Kr. Jain
6. Snowline estimation snowmelt runoff study and Glacial Lake Outburst Flood Study For Chamkarchu H.E. Project in Bhutan, NHPC NHPC Ltd. 9 months Dr.Sanjay Kr. Jain
7. GLOF study of Bokang-Bailing H.E. Project, THDC THDC India Ltd 6 months Dr.Sanjay Kr. Jain
8. Glacier Lake Outburst Flood (GLOF) study for Malari Jelam H. E. Project , THDC THDC India Ltd 2 months Dr.Sanjay Kr. Jain
9. Snowline estimation snowmelt runoff study and Glacial Lake Outburst Flood Study For Kuri Gongri H.E. Project in Bhutan NHPC Ltd. 9 months Dr.Sanjay Kr. Jain
1o. GIS Map for the entire catchment of Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme, Nepal NWDA 5 months Dr.Sanjay Kr. Jain
11. Design flood estimate for Pagal Nallah, BRO DGBR Leh 6 months Dr.Sanjay Kr. Jain
12. Dam break analysis for Teesta Low Dam- III Power station barrage NHPC Ltd. 9 Months Dr.Sanjay Kr. Jain
13. Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Teesta V) NHPC Ltd. 9 Months Dr.Sanjay Kr. Jain
14. Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Rangit dam) NHPC Ltd. 9 Months Dr.Sanjay Kr. Jain
15. Flood plain zoning for safe habitation and commercial construction along the river banks in Uttarakhand IRI, Roorkee 9 months Dr.Sanjay Kr. Jain
16. Carrying Capacity for the basins of Alaknanda in respect of HE Projects AHEC,
IIT Roorkee
15 months Dr.Sanjay Kr. Jain
17. Carrying Capacity for the basins of Bhagirathi in respect of HE Projects by AHEC AHEC,
IIT Roorkee
15 months Dr. Manish Nema
18. Project-wise Water Availability and Integrated Operation Analysis of Major Projects in Krishna Basin I&CAD, Govt. of AP 10
months
Dr. Sharad Kr. Jain
 
19. Hydrological Studies and Multi-Reservoir Simulation for Proposed Mahanadi-Godavari Link NWDA 15 Months Dr. M. K Goel
20. Vetting of water availability studies for Gulf of Khambhat Development Project Gulf of Khambhat Development Project (WR), Govt. of Gujarat 9 months Dr. M. K Goel
21. Hydrological Studies and Multi-reservoir Simulation Studies for Detailed Project Report of Ken – Betwa Link (Phase – II) NWDA 6 months Dr. M. K Goel