Menu

Consultancy Services

S.N.

Title

Sponsoring Agency

Duration

Cost

(Lakhs)

PI

1.

Cumulative environment impact assessment studies for Satluj basin in Himachal Pradesh

AHEC,

IIT, Roorkee

12 months

 

23.23

Dr. Sharad Kr. Jain

 

2.

Cumulative environment impact assessment studies for Yamuna basin

Uttrakhand Jal Vidyut Nigam, Dehradun

10 months

15.69

Dr. Sharad Kr. Jain

 

3.

Cumulative impact study of hydropower projects on Alaknanda & its tributaries and tributaries of Bhagirathi river, Uttarakhand

Uttrakhand Jal Vidyut Nigam, Dehradun

12 months

60.62

Dr. Sharad Kr. Jain

 

4.

Gangetic aquifer management for Ecosystem services (GAMES) study

IWMI Srilanka

12 months

16.91

Dr. Sharad Kr. Jain

 

5.

Glacial Lake Outburst Flood (GlOF) Study For Jelam Tamak H.E. Project, THDC

THDC India Ltd.

2 months

0.97

Dr.Sanjay Kr. Jain

6.

Snowline estimation snowmelt runoff study and Glacial Lake Outburst Flood Study For Chamkarchu H.E. Project in Bhutan, NHPC

NHPC Ltd.

9 months

22.00

Dr.Sanjay Kr. Jain

7.

GLOF study of Bokang-Bailing H.E. Project, THDC

THDC India Ltd

6 months

9.43

Dr.Sanjay Kr. Jain

8.

Glacier Lake Outburst Flood (GLOF) study for Malari Jelam H. E. Project , THDC

THDC India Ltd

2 months

0.975

Dr.Sanjay Kr. Jain

9.

Snowline estimation snowmelt runoff study and Glacial Lake Outburst Flood Study For Kuri Gongri H.E. Project in Bhutan

NHPC Ltd.

9 months

22.00

Dr.Sanjay Kr. Jain

1o.

GIS Map for the entire catchment of Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme, Nepal

NWDA

5 months

18.11

Dr.Sanjay Kr. Jain

11.

Design flood estimate for Pagal Nallah, BRO

DGBR Leh

6 months

5.39

Dr.Sanjay Kr. Jain

12.

Dam break analysis for Teesta Low Dam- III Power station barrage

NHPC Ltd.

9 Months

14.49

Dr.Sanjay Kr. Jain

13.

Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Teesta V)

NHPC Ltd.

9 Months

14.56

Dr.Sanjay Kr. Jain

14.

Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Rangit dam)

NHPC Ltd.

9 Months

14.56

Dr.Sanjay Kr. Jain

15.

Flood plain zoning for safe habitation and commercial construction along the river banks in Uttarakhand

IRI, Roorkee

9 months

19.46

Dr.Sanjay Kr. Jain

16.

Carrying Capacity for the basins of Alaknanda in respect of HE Projects

AHEC,

IIT Roorkee

15 months

12.02

Dr.Sanjay Kr. Jain

17.

Carrying Capacity for the basins of Bhagirathi in respect of HE Projects by AHEC

AHEC,

IIT Roorkee

15 months

10.12

Dr. Manish Nema

18.

Project-wise Water Availability and Integrated Operation Analysis of Major Projects in Krishna Basin

I&CAD, Govt. of AP

10

months

85.15

Dr. Sharad Kr. Jain

 

19.

Hydrological Studies and Multi-Reservoir Simulation for Proposed Mahanadi-Godavari Link

NWDA

15 Months

18.11

Dr. M. K Goel

20.

Vetting of water availability studies for Gulf of Khambhat Development Project

Gulf of Khambhat Development Project (WR), Govt. of Gujarat

9 months

7.99

Dr. M. K Goel

21.

Hydrological Studies and Multi-reservoir Simulation Studies for Detailed Project Report of Ken – Betwa Link (Phase – II)

NWDA

6 months

26.97

Dr. M. K Goel