S.N. Title Sponsoring Agency Duration Cost (Lakhs) PI
1. Cumulative Environment Impact Assessment Studies for Satluj basin in Himachal Pradesh AHEC, IIT Roorkee 12 months 23.23 Sharad K. Jain
2. Cumulative Environment Impact Assessment Studies for Yamuna basin Uttrakhand Jal Vidyut Nigam 10 months 15.69 Sharad K. Jain
3. Cumulative Impact Study of Hydropower Projects on Alaknanda & its tributaries and tributaries of Bhagirathi river, Uttarakhand Uttrakhand Jal Vidyut Nigam 12 months 60.62 Sharad K. Jain
4. Gangetic Aquifer Management for Ecosystem Services (GAMES) study IWMI, Sri Lanka 12 months 16.91 Sharad K. Jain
5. Glacial Lake Outburst Flood (GlOF) Study for Jhelam Tamak H.E. Project, THDC THDC Ltd. 2 months 0.97 Sanjay K. Jain
6. Snowline Estimation Snowmelt Runoff study and Glacial Lake Outburst Flood Study For Chamkarchu H.E. Project in Bhutan, NHPC NHPC Ltd. 9 months 22.00 Sanjay K. Jain
7. GLOF study of Bokang-Bailing H.E. Project, THDC THDC Ltd 6 months 9.43 Sanjay K. Jain
8. Glacier Lake Outburst Flood (GLOF) study for Malari Jelam H. E. Project , THDC THDC Ltd 2 months 0.975 Sanjay K. Jain
9. Snowline Estimation Snowmelt Runoff study and Glacial Lake Outburst Flood Study For Kuri Gongri H.E. Project in Bhutan NHPC Ltd. 9 months 22.00 Sanjay K. Jain
10. GIS Map for the entire catchment of Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme, Nepal NWDA 5 months 18.11 Sanjay K. Jain
11. Design flood estimate for Pagal Nallah, BRO DGBR Leh 6 months 5.39 Sanjay K. Jain
12. Dam break analysis for Teesta Low Dam- III Power station barrage NHPC Ltd. 9 Months 14.49 Sanjay K. Jain
13. Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Teesta V) NHPC Ltd. 9 Months 14.56 Sanjay K. Jain
14. Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Rangit dam) NHPC Ltd. 9 Months 14.56 Sanjay K. Jain
15. Flood plain zoning for safe habitation and commercial construction along the river banks in Uttarakhand IRI Roorkee 9 months 19.46 Sanjay K. Jain
16. Carrying Capacity for the basins of Alaknanda in respect of HE Projects AHEC, IIT Roorkee 15 months 12.02 Sanjay K. Jain
17. Carrying Capacity for the basins of Bhagirathi in respect of HE Projects by AHEC AHEC, IIT Roorkee 15 months 10.12 M. K. Nema
18. Project-wise Water Availability and Integrated Operation Analysis of Major Projects in Krishna Basin I&CAD, Govt. of AP 10 months 85.15 Sharad K. Jain
19. Hydrological Studies and Multi-Reservoir Simulation for Proposed Mahanadi-Godavari Link NWDA 15 Months 18.11 M. K. Goel
20. Vetting of Water Availability Studies for Gulf of Khambhat Development Project Gulf of Khambhat Development Project (WR), Govt. of Gujarat 9 months 7.99 M. K. Goel
21. Hydrological Studies and Multi-Reservoirs Simulation Studies for Detailed Project Report of Ken – Betwa Link (Phase – II) NWDA 6 months 26.97 M. K. Goel
22. Hydrological Studies of two Operational Hydro projects in Himachal Pradesh JSW HE Ltd. 6 months 25.37 Sanjay K. Jain
23. Dam Break Analysis and Inundation map, Bakreshwar Dam West Bengal WBPDC Ltd 8 months 15.22 Sanjay K. Jain
24. Water Availability Study at Hathni Kund Barrage- Pre and Post Construction of 3 multipurpose projects in Upper Yamuna Basin UJVNL, Dehradun 6 months 11.80 M. K. Goel
25. Study of various Possible Scenarios for Understanding the Long-term effect of en-route canal irrigation for Mahandi- Godavari Link NWDA 12 months 85.00 M. K. Goel
26. Land use Planning of Farakka Barrage Project area Farakka barrage project MOWR 10 months 46.69 D. S. Rathore
27. Flood routing in the reach between Rajghat and Matatila dam in Betwa River basin for the proposed Dhurwara dam project IWRD Govt of UP 5 months 9.44 M. K. Goel
28. Hydrological Aspects of Saraswati River Rejuvenation and Heritage Development project: review and observation of study reports & Hydrological Analysis of Balancing Reservoir HSHDB & Haryana Irrigation & Water Resources Development 3 months 5.90 M. K. Goel