S.N. |
Title |
Sponsoring Agency |
Duration |
PI |
---|
1. |
Cumulative Environment Impact Assessment Studies for Satluj basin in Himachal Pradesh |
AHEC, IIT Roorkee
|
12 months |
Sharad K. Jain |
2. |
Cumulative Environment Impact Assessment Studies for Yamuna basin |
Uttrakhand Jal Vidyut Nigam |
10 months |
Sharad K. Jain |
3. |
Cumulative Impact Study of Hydropower Projects on Alaknanda & its tributaries and tributaries of Bhagirathi river, Uttarakhand |
Uttrakhand Jal Vidyut Nigam |
12 months |
Sharad K. Jain |
4. |
Gangetic Aquifer Management for Ecosystem Services (GAMES) study |
IWMI, Sri Lanka |
12 months |
Sharad K. Jain |
5. |
Glacial Lake Outburst Flood (GlOF) Study for Jhelam Tamak H.E. Project, THDC |
THDC Ltd. |
2 months |
Sanjay K. Jain |
6. |
Snowline Estimation Snowmelt Runoff study and Glacial Lake Outburst Flood Study For Chamkarchu H.E. Project in Bhutan, NHPC |
NHPC Ltd. |
9 months |
Sanjay K. Jain |
7. |
GLOF study of Bokang-Bailing H.E. Project, THDC |
THDC Ltd |
6 months |
Sanjay K. Jain |
8. |
Glacier Lake Outburst Flood (GLOF) study for Malari Jelam H. E. Project , THDC |
THDC Ltd |
2 months |
Sanjay K. Jain |
9. |
Snowline Estimation Snowmelt Runoff study and Glacial Lake Outburst Flood Study For Kuri Gongri H.E. Project in Bhutan |
NHPC Ltd. |
9 months |
Sanjay K. Jain |
10. |
GIS Map for the entire catchment of Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme, Nepal |
NWDA |
5 months |
Sanjay K. Jain |
11. |
Design flood estimate for Pagal Nallah, BRO |
DGBR Leh |
6 months |
Sanjay K. Jain |
12. |
Dam break analysis for Teesta Low Dam- III Power station barrage |
NHPC Ltd. |
9 Months |
Sanjay K. Jain |
13. |
Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Teesta V) |
NHPC Ltd. |
9 Months |
Sanjay K. Jain |
14. |
Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Rangit dam) |
NHPC Ltd. |
9 Months |
Sanjay K. Jain |
15. |
Flood plain zoning for safe habitation and commercial construction along the river banks in Uttarakhand |
IRI Roorkee |
9 months |
Sanjay K. Jain |
16. |
Carrying Capacity for the basins of Alaknanda in respect of HE Projects |
AHEC, IIT Roorkee |
15 months |
Sanjay K. Jain |
17. |
Carrying Capacity for the basins of Bhagirathi in respect of HE Projects by AHEC |
AHEC, IIT Roorkee |
15 months |
M. K. Nema |
18. |
Project-wise Water Availability and Integrated Operation Analysis of Major Projects in Krishna Basin |
I&CAD, Govt. of AP |
10 months |
Sharad K. Jain |
19. |
Hydrological Studies and Multi-Reservoir Simulation for Proposed Mahanadi-Godavari Link |
NWDA |
15 Months |
M. K. Goel |
20. |
Vetting of Water Availability Studies for Gulf of Khambhat Development Project |
Gulf of Khambhat Development Project (WR), Govt. of Gujarat |
9 months |
M. K. Goel |
21. |
Hydrological Studies and Multi-Reservoirs Simulation Studies for Detailed Project Report of Ken – Betwa Link (Phase – II) |
NWDA |
6 months |
M. K. Goel |
22. |
Hydrological Studies of two Operational Hydro projects in Himachal Pradesh |
JSW HE Ltd. |
6 months |
Sanjay K. Jain |
23. |
Dam Break Analysis and Inundation map, Bakreshwar Dam West Bengal |
WBPDC Ltd |
8 months |
Sanjay K. Jain |
24. |
Water Availability Study at Hathni Kund Barrage- Pre and Post Construction of 3 multipurpose projects in Upper Yamuna Basin |
UJVNL, Dehradun |
6 months |
M. K. Goel |
25. |
Study of various Possible Scenarios for Understanding the Long-term effect of en-route canal irrigation for Mahandi- Godavari Link |
NWDA |
12 months |
M. K. Goel |
26. |
Land use Planning of Farakka Barrage Project area |
Farakka barrage project MOWR |
10 months |
D. S. Rathore |
27. |
Flood routing in the reach between Rajghat and Matatila dam in Betwa River basin for the proposed Dhurwara dam project |
IWRD Govt of UP |
5 months |
M. K. Goel |
28. |
Hydrological Aspects of Saraswati River Rejuvenation and Heritage Development project: review and observation of study reports & Hydrological Analysis of Balancing Reservoir |
HSHDB & Haryana Irrigation & Water Resources Development |
3 months |
M. K. Goel |