Menu
emblem

Consultancy Projects

S.No Title
1 Estimation of water availability and flood estimation study for Parvati river project. (MPWRD)
2 Hydrological study of proposed cement plant and mining lease area of JayKayCem (Central) Ltd in Panna District. (JayKayCem (Central) Ltd. Panna)
3 Vetting of hydrology of Nawatha barrage major lift irrigation project (MPWRD)
4 Vetting of hydrology of Jhirmiti barrage medium irrigation project (MPWRD)
5 Vetting of hydrology of Kaneralift irrigation project (MPWRD)
6 Plaining of rainwater harvesting work at IIT Indore. (CPWD, IIT Division Indore)
7 Field survey for identification of sites for riverbank filtration in Sagar district of MP(Under the ‘SaphPani Project’)
8 Hydrological study for rural drinking water supply in part of the Bundelkhand region of Uttar Pradesh. (PHE, UP, Lakhnow)
9 Assessment of the impact of coal mining from Mahan coal block on groundwater recharge and sedimentation in Rihand Reservoir and to suggest appropriate measures to mitigate the identified impacts. (Mahan Coal Ltd, Waidhan, Singroli, M.P.)
10 Study of hydrological and hydrogeological aspects of Korba Power Project in Chhattisgarh to assess water source sustainability. (Avantha Power & Infrastructure Limited, Gurgaon, Haryana)
11 DPR for implementing Pilot Project on ‘building climate resilience of communities through participatory groundwater management in Burhanpur and Ratlam districts of Madhya Pradesh. (MPWRD)
12 Preparation of working of working table for multiple Reservoirs of Bina Complex. (MPWRD)
13 Identification of suitable sites for water storage structures in Rehli and Garhakota blocks of Sagar district Zilla Panchayat, Sagar. (Zilla Panchayat, Sagar)
14 Emergency Action Plan for three Dams (Kunwarchainsagar, Nahalesara, and Ari dams) (BODHI, MPWRD)
15 Emergency action plan for six Dams (Umrar, Marhi, Kanhargaon, Thanwar, Moorumnalla, and Chandpatha dams) (BODHI, MPWRD)
Page last updated on 01.02.2023