Menu
emblem

Consultancy Services

S.N. Title Sponsoring Agency Duration PI
1. Cumulative Environment Impact Assessment Studies for Satluj basin in Himachal Pradesh AHEC, IIT Roorkee 12 months Sharad K. Jain
2. Cumulative Environment Impact Assessment Studies for Yamuna basin UJVNL 10 months Sharad K. Jain
3. Cumulative Impact Study of Hydropower Projects on Alaknanda & its tributaries and tributaries of Bhagirathi river, Uttarakhand UJVNL 12 months Sharad K. Jain
4. Gangetic Aquifer Management for Ecosystem Services (GAMES) study IWMI, Sri Lanka 12 months Sharad K. Jain
5. Glacial Lake Outburst Flood (GlOF) Study for Jhelam Tamak H.E. Project, THDC THDC Ltd. 2 months Sanjay K. Jain
6. Snowline Estimation Snowmelt Runoff study and Glacial Lake Outburst Flood Study For Chamkarchu H.E. Project in Bhutan, NHPC NHPC Ltd. 9 months Sanjay K. Jain
7. GLOF study of Bokang-Bailing H.E. Project, THDC THDC Ltd 6 months Sanjay K. Jain
8. Glacier Lake Outburst Flood (GLOF) study for Malari Jelam H. E. Project , THDC THDC Ltd 2 months Sanjay K. Jain
9. Snowline Estimation Snowmelt Runoff study and Glacial Lake Outburst Flood Study For Kuri Gongri H.E. Project in Bhutan NHPC Ltd. 9 months Sanjay K. Jain
10. GIS Map for the entire catchment of Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage-cum-Diversion Scheme, Nepal NWDA 5 months Sanjay K. Jain
11. Design flood estimate for Pagal Nallah, BRO DGBR Leh 6 months Sanjay K. Jain
12. Dam break analysis for Teesta Low Dam- III Power station barrage NHPC Ltd. 9 Months Sanjay K. Jain
13. Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Teesta V) NHPC Ltd. 9 Months Sanjay K. Jain
14. Dam Break Analysis for preparation of Emergency Action Plan and Inundation map (Rangit dam) NHPC Ltd. 9 Months Sanjay K. Jain
15. Flood plain zoning for safe habitation and commercial construction along the river banks in Uttarakhand IRI Roorkee 9 months Sanjay K. Jain
16. Carrying Capacity for the basins of Alaknanda in respect of HE Projects AHEC, IIT Roorkee 15 months Sanjay K. Jain
17. Carrying Capacity for the basins of Bhagirathi in respect of HE Projects by AHEC AHEC, IIT Roorkee 15 months M. K. Nema
18. Project-wise Water Availability and Integrated Operation Analysis of Major Projects in Krishna Basin I&CAD, Govt. of AP 10 months Sharad K. Jain
19. Hydrological Studies and Multi-Reservoir Simulation for Proposed Mahanadi-Godavari Link NWDA 15 Months M. K. Goel
20. Vetting of Water Availability Studies for Gulf of Khambhat Development Project Gulf of Khambhat Development Project (WR), Govt. of Gujarat 9 months M. K. Goel
21. Hydrological Studies and Multi-Reservoirs Simulation Studies for Detailed Project Report of Ken – Betwa Link (Phase – II) NWDA 6 months M. K. Goel
22. Hydrological Studies of two Operational Hydro projects in Himachal Pradesh JSW HE Ltd. 6 months Sanjay K. Jain
23. Dam Break Analysis and Inundation map, Bakreshwar Dam West Bengal WBPDC Ltd 8 months Sanjay K. Jain
24. Water Availability Study at Hathni Kund Barrage- Pre and Post Construction of 3 multipurpose projects in Upper Yamuna Basin UJVNL, Dehradun 6 months M. K. Goel
25. Study of various Possible Scenarios for Understanding the Long-term effect of en-route canal irrigation for Mahandi- Godavari Link NWDA 12 months M. K. Goel
26. Land use Planning of Farakka Barrage Project area Farakka barrage project MOWR 10 months D. S. Rathore
27. Flood routing in the reach between Rajghat and Matatila dam in Betwa River basin for the proposed Dhurwara dam project IWRD Govt of UP 5 months M. K. Goel
28. Hydrological Aspects of Saraswati River Rejuvenation and Heritage Development project: review and observation of study reports & Hydrological Analysis of Balancing Reservoir HSHDB & Haryana Irrigation & Water Resources Development 3 months M. K. Goel


Page last updated on 10.02.2023