| S. N. | Title | Duration | PI | Status |
| 1. | Assessment of Groundwater Rise Crisis in Jodhpur City, Rajasthan: A Comprehensive Follow-up Study with Challenges and Remedial Approaches |
1.4 Years (11/23 – 03/25) |
Dr. Sourabh Nema
|
Completed |
| 2. | Identification of Heterogeneous Crops at Farm Scale using Remote Sensing Data in IGNP Canal Command Area | 1.4 Years (12/23 – 03/25) |
Sh. Sudesh S. Choudhary |
Completed |
| 3. | Hydrological Monitoring in Jojari River Basin | 1.4 Years (12/23 – 03/26) |
Dr. Sourabh Nema
|
Ongoing |
| 4. | Analyzing the Flash Flood events in the Luni River Basin and Remedial Measures to Store Excess Water |
1.9 Years (04/24 – 12/25) |
Sh. Akshay V. Dahiwale
|
Ongoing |
| 5. | Assessment of Water Productivity, Land Productivity and Agricultural Drought in Luni River Basin |
2 Years (04/24 – 03/26) |
Sh. Dilip Barman |
Ongoing |
| 6. | Assessment of the Diversified Crop Types Using Remote Sensing Data in Luni River Basin |
2.6 Years (04/24 – 09/26) |
Sh. Malkhan Singh Jatav |
Ongoing |
| 7. | Sustainable Water Management and Recharge Strategies for Water Security in Alwar District | 2 years (04/25-03/27) |
Sh. Sudesh S. Choudhary |
Ongoing |
| 8. | Enhancing Dam Safety through Rapid Risk Assessment and Dam Break Analysis: A Case Study of Selected Dams in Rajasthan and Gujarat | 2 years (04/25 -03/27) |
Sh. Akshay V. Dahiwale
|
Ongoing |
| 9. | Assessment of ET-based irrigation performance | 2 years (04/25 -03/27) |
Sh. Sudesh S. Choudhary |
Ongoing |
| 10. | Evaluating the Impact of Toilets on GW & SW in Diverse Hydrogeological & Climatic Conditions | 3 Years (05/25-04/28) |
Dr. Sourabh Nema
|
Ongoing
|
Internal R&D Studies
English




राष्ट्रीय जलविज्ञान संस्थान, रुड़की, भारत
